Location: Georgetown, Kentucky                                 Size:  313,000 SF
Owner:  Toyota Motor Manufacturing Kentucky
Delivery Method: : General Contractor
Project Value: $30,000,000

 

Stenco began Weld Addition Phase 1, in 2014 which included site work, foundations, concrete slabs, and structural steel to support a 23,000 square foot expansion of the body weld shop. Challenges included an aggressive delivery schedule, design changes, and unforeseen bedrock conditions. Stenco was able to work with Toyota to deliver the project on time.  

The successful completion of the Weld Additional Phase 1 project assisted. Stenco in securing six additional building expansion projects. In total, Stenco is responsible for the site work, foundations and slab on grade for approximately 313,000 square feet of additional building space.

Weld Addition Phase 2 and Bumper Paint projects are connections to the existing facility. Bumper Paint, Building 604, and Building 609 projects include concrete slab on grade within their paint mixing and storage areas. The end result of this process provides a hard, non-dusting, high strength surface that will prevent electrical spark.

FCA SHAP Body Shop: Concrete Foundations, Pits, Grade Beam
Toyota Motor Manufacturing
Nissan Motor Company
Ford Motor Company: Kentucky Truck Plant - P558 Super Duty Program
Ford Livonia Transmission Plant: Valve Body Assembly Clean Room
Toyota Tech Center: Powertrain Expansion
Ford Livonia Transmission: South Chiller Building
American Axle: Tech Center Office Renovations
Toyota Motor Manufacturing Alabama: Pre-Construction & Foundations
Ford Motor Company: Construction Commodity Management
Looking for a top level contractor for your next big interior buildout?
Trust Stenco to deliver the highest in quality and customer satisfaction - on time and on budget.
Request A Bid